Slurry Pump RFQ Checklist: What Information Should Buyers Provide?
Time:
2026-10-12
Use this slurry pump RFQ checklist to prepare flow, head, solids, installation and supply details so suppliers can review the duty and quote clearly
Inquiry brief: Define the operating duty and supply scope, and mark any information that still needs confirmation.
A useful slurry pump RFQ checklist covers the required flow and head, slurry properties, suction conditions, installation constraints and equipment to be supplied. These details help suppliers assess the duty and prepare quotations on a consistent basis.
A request stating only “mining slurry pump, 150 m³/h” leaves important questions unanswered. The supplier still needs to understand the required head, solids, operating range and whether the inquiry includes a motor, baseplate or other equipment.
You do not need every answer before making initial contact. Send the available information, identify estimates and ask which missing measurements are necessary. Distinguish a preliminary budget quotation from a confirmed technical offer.
Start with the Application and Hydraulic Duty
Describe what the pump transfers, where it takes suction and where it discharges. Include operating hours, the number of pumps required and whether they operate as duty, standby or combined units.
Report flow with units and distinguish slurry volume from dry-solids throughput. Where applicable, provide normal and alternative operating duties.
State the required total head and its calculation basis. Vertical lift alone is not total head: piping losses, pressure requirements and inlet conditions also matter. Pump head and pressure are related quantities, but their conversion depends on fluid density.
If head is not yet calculated, provide the pipeline layout, internal diameters, lengths, elevations, fittings and discharge-pressure requirement. Identify the uncertainty instead of supplying an unsupported figure.
Describe the Slurry Clearly
Include slurry density or SG, solids concentration and whether the concentration is by mass or volume. Report particle-size distribution and the maximum credible particle size, including occasional oversize.
Also provide solids type, particle shape, temperature, pH and relevant chemicals. Mention froth, entrained air or unusual flow behaviour where present.
The Hydraulic Institute identifies mixture density and solids characteristics as selection inputs. It also distinguishes concentration by mass from concentration by volume; these values should not be used interchangeably. HI Data Tool
Use representative operating data where available. A sample from an unusually dilute period may not describe the conditions the pump must normally handle.
Use This RFQ Preparation Checklist
The following table helps determine what to send and how to handle missing information.
| RFQ item | Information to provide | If it is not available |
|---|---|---|
| Application | Material, transfer points and operating schedule | Explain the process and attach a simple sketch |
| Flow | Slurry flow, units and operating range | Provide solids throughput, concentration and density data |
| Head | Required total head and calculation basis | Supply the piping layout and pressure requirements |
| Slurry properties | SG, concentration basis, particle sizes, chemistry and temperature | Mark estimates and arrange representative measurements |
| Suction conditions | Minimum liquid level, suction layout and site elevation | Attach dimensions, photographs or installation drawings |
| Power and drive | Voltage, frequency, drive preference and speed-control requirement | Confirm the available site supply |
| Supply scope | Pump, motor, drive, baseplate, controls and accessories as applicable | Request separately priced options |
| Documentation and testing | Required drawings, records and acceptance requirements | Ask what is included in the standard offer |
| Delivery | Quantity, destination and required date | State the planning window and delivery assumptions |
For initial contact, prioritize application, available duty data and slurry characteristics. Installation and supply details should then be resolved sufficiently for a firm offer.
Include Installation and Supply Boundaries
Provide the minimum feed level and suction arrangement, especially where levels change during operation. Note available space, connection requirements and access for maintenance.
For an existing installation, attach nameplate information, operating speed, measured performance and photographs. If the objective is to improve performance, say what the present equipment is failing to achieve rather than requesting an identical replacement automatically.
Define what “complete pump” means in your inquiry. Suppliers may otherwise quote different combinations of pump, motor, drive, baseplate and accessories.
The available slurry pump product range can help identify relevant configurations, but the final RFQ should describe the required duty rather than rely on a category name.
Where the requirement concerns individual components, use What Information Is Needed to Order Replacement Slurry Pump Parts? instead of treating a parts order as a complete-pump selection.
State Documentation and Testing Requirements

Identify required drawings, manuals, material records and inspection documents. Where testing is needed, agree on the test type, conditions, acceptance criteria and reporting.
ANSI/HI 14.6 addresses acceptance testing of rotodynamic pumps, including hydraulic performance testing. Referring to a standard is a starting point; the order still needs a defined test scope. Pumps.org
Do not assume that every quoted pump includes a witnessed performance test or that a clear-water test establishes abrasive wear life. Ask the supplier to state what is included, optional or excluded.
Supplier capability is a separate purchasing question. See How to Evaluate a Slurry Pump Manufacturer Before Requesting a Quote when building the shortlist.
Illustrative RFQ: Separate Confirmed Data from Estimates
Illustrative example only—not a customer project or product rating.
A plant requests two pump sets: one duty and one standby. Its initial brief includes:
| Item | Example entry |
|---|---|
| Application | Mineral slurry transfer from an open sump |
| Normal slurry flow | 150 m³/h, based on process calculations |
| Required head | Approximately 28 m; piping-loss calculation pending |
| Solids concentration | 30% by mass |
| Solids SG / carrier-liquid SG | 2.70 / 1.00 |
| Maximum particle size | 5 mm observed; upset conditions not yet assessed |
| Temperature / pH | 35°C / 8 |
| Supply scope | Pump, motor, drive and baseplate |
| Power supply | 400 V, 50 Hz |
| Attachments | Preliminary pipeline drawing and sump dimensions |
The supplier can begin reviewing the application, but several items remain open. The head requires confirmation, occasional oversize needs assessment and suction conditions must be checked.
The appropriate outcome is a preliminary offer with stated assumptions and a list of remaining inputs—not an unconditional model recommendation.
Send the same updated brief to shortlisted suppliers so changes do not create unequal quotation bases.
Frequently Asked Questions
👉Can I request a quote without knowing the required head?
Yes, for a preliminary review. Provide the pipeline and pressure information, and clearly state that head remains to be calculated.
👉Is the existing pump model enough?
It helps with identification, but include actual duty and slurry data. Existing equipment may no longer match the current process.
👉Should I specify the wet-end material?
State any mandatory specification and the reason for it. Otherwise, provide slurry conditions and ask the supplier to explain its proposed material grade.
👉Can the supplier select the motor from flow alone?
No. Flow alone does not establish pump power. Head, slurry properties, efficiency, speed and the operating range also require review.
👉How can I compare quotations fairly?
Align technical assumptions, equipment scope, documents, tests, delivery terms and exclusions before comparing the total price.
Submit Your Pump RFQ
Send the completed checklist and available drawings through the slurry pump quotation request. Mark each important value as measured, calculated, estimated or pending.
Include required flow, head, slurry density, solids concentration, maximum particle size, pH, temperature and application, together with installation and supply requirements. This gives the supplier a clearer basis for technical review and quotation.
Key word:
Related Reading
Leave us a message
If you are interested in our products, please leave your email and we will contact you as soon as possible. Thank you!